AboutProjectsServicesNewsContactEmployment










The evaluation of the following constraints produces optimum utilization of land resources on a site-specific basis and is an essential component to the development of a site master plan.
  1. Analysis of Zoning and Subdivision Ordinances
  2. Support Utilities Analysis for Availability and Capacity (Water, Sanitary Sewer, Gas, Electric)
  3. Traffic Impact Studies
  4. Highway Noise Analysis Studies
  5. Intramodal Transportation Studies
  6. Steep Slopes Analysis
  7. Floodplain Review and Determination
  8. Wetlands Determination and Evaluation
  9. Natural Features Inventory
  10. Soils Suitability and Stability Evaluations
  11. Resource Protection Area Analysis
  12. Groundwater Recharge Analysis and System Design
  13. Septic system/Sanitary Waste Disposal Feasability
  14. Stormwater Management and Storm Drainage System Criteria
  15. Community Facilities Evaluations (Library, Fire, Police, Parks, Schools, Hospitals)
  16. Existance of Perimeter and Topographic Surveys
  17. Phase I Site Audit - Environmental Concerns
    1. Site History
      1. Review Aerial Photos
      2. Review Historic Maps
      3. Review Ownership History
    2. Site Setting
      1. Geography
      2. Geology
      3. Hydrology
      4. Soils
    3. Regulatory Review
      1. CERCLIS, HSCA, UST (DNREC) Sites Review (use "ERLIS")
      2. Wetlands
      3. WRPA Mapping
      4. Flood Plain (FEMA)
      5. Solid Waste, Asbestos, etc. (use DNREC)
    4. Site Reconnaissance
      1. Disturbed Area
      2. Stained Soils
      3. Solid Waste
      4. Adjoining Properties
      5. Surface Waters - Odors, Sheen, etc.
    5. Conclusions and Recommendations



Home :: About :: Projects :: Services :: News :: Contact :: Employment

©2002 Landmark Engineering 302.323.9377 :: Site by Iron Monkey Interactive